Politika piškotkov Cookie policy

To spletno mesto uporablja piškotke.

Z nadaljevanjem uporabe strani se strinjate z uporabo le-teh.

Kliknite za več informacij o piškotkih.

This site uses cookies.

By continuing to use the site, you agree to use them.

Click here for more information about cookies.

Dovoli vse piškotke
Allow all cookies
Uporabi le zahtevane piškotke
Use only the required cookies

 + 386 (0)1 620 33 20    info@geoportal.siExternal link opens in new tab or windowExternal link opens in new tab or windowExternal link opens in new tab or windowExternal link opens in new tab or windowExternal link opens in new tab or window

     


    Menu
    • Link Icon Link Icon Link Icon Domov
      • Link Icon Link Icon Link Icon O podjetju
        • External link opens in new tab or window Link Icon Link Icon Link Icon O nas
        • External link opens in new tab or window Link Icon Link Icon Link Icon Vizitka
        • External link opens in new tab or window Link Icon Link Icon Link Icon Lokacija
        • External link opens in new tab or window Link Icon Link Icon Link Icon Zaposleni
        • External link opens in new tab or window Link Icon Link Icon Link Icon Inštitut
      • Link Icon Link Icon Link Icon Storitve
        • External link opens in new tab or window Link Icon Link Icon Link Icon Predori in veliki podzemni prostori
        • External link opens in new tab or window Link Icon Link Icon Link Icon Gradbene jame
        • External link opens in new tab or window Link Icon Link Icon Link Icon Sanacije plazov
        • External link opens in new tab or window Link Icon Link Icon Link Icon Geologija in geotehnika
        • External link opens in new tab or window Link Icon Link Icon Link Icon Luške konstrukcije
        • External link opens in new tab or window Link Icon Link Icon Link Icon Deponije
        • External link opens in new tab or window Link Icon Link Icon Link Icon Visoke gradnje
        • External link opens in new tab or window Link Icon Link Icon Link Icon Izdelava energetskih izkaznic
        • External link opens in new tab or window Link Icon Link Icon Link Icon BIM
      • External link opens in new tab or window Link Icon Link Icon Link Icon REFERENCE
        • External link opens in new tab or window Link Icon Link Icon Link Icon kontakt
          • Link Icon Link Icon Link Icon Home
            • Link Icon Link Icon Link Icon About the company
              • Link Icon Link Icon Link Icon About us
              • Link Icon Link Icon Link Icon Business card
              • Link Icon Link Icon Link Icon Location
              • Link Icon Link Icon Link Icon Employees
              • Link Icon Link Icon Link Icon Institute
            • Link Icon Link Icon Link Icon Services
              • Link Icon Link Icon Link Icon Tunnels and large underground spaces
              • Link Icon Link Icon Link Icon Construction pits
              • Link Icon Link Icon Link Icon Landslide redevelopment
              • Link Icon Link Icon Link Icon Geology and geotechnics
              • Link Icon Link Icon Link Icon Port constructions
              • Link Icon Link Icon Link Icon Landfills
              • Link Icon Link Icon Link Icon Structural engineering
              • Link Icon Link Icon Link Icon Production of energy certificates
              • Link Icon Link Icon Link Icon BIM
            • Link Icon Link Icon Link Icon REFERENCES
              • Link Icon Link Icon Link Icon Contact
                • Link Icon Link Icon Link Icon REFERENCES
                • Link Icon Link Icon Link Icon Tunnel References
                • Link Icon Link Icon Link Icon Construction Pit References
                • Link Icon Link Icon Link Icon Landslide Redevelopment References
                • Link Icon Link Icon Link Icon Geology and Geotechnics References
                • Link Icon Link Icon Link Icon Port Construction References
                • Link Icon Link Icon Link Icon Landfill References
                • Link Icon Link Icon Link Icon High Construction References
                • Link Icon Link Icon Link Icon BIM

                Tunnel References

                Tunnel Cenkova

                Project documentation: Project for obtaining a building permit, project for tender, project for implementation, project for operation and maintenance

                Investor: DARS, Družba za avtoceste v Republiki Sloveniji d.d.

                Object properties: The tunnel is two-tubed and two-laned, length L=360 m


                The highway section A5 Maribor – Hungarian border (Sp. Senarska – Cogetinci) includes the two-tubed tunnel Cenkova. The special feature of the tunnel is its small cross section width, which dictated the construction of tunnel tubes with the execution of an intermediate tube. The tunnel was entirely executed through mechanical excavation using a tunnel excavator and according to the principles of NATM. We performed all project phases for the client.



                https://0501.nccdn.net/4_2/000/000/04c/a91/25660_1555057890_66_25660.jpg
                https://0501.nccdn.net/4_2/000/000/081/4ce/30740_1555057890_116_30740.jpg
                https://0501.nccdn.net/4_2/000/000/04c/a91/25660_1555057890_66_25660.jpg
                https://0501.nccdn.net/4_2/000/000/081/4ce/30740_1555057890_116_30740.jpg
                Predor Ljubno leva cev

                Project documentation: Project for obtaining a building permit, project for tender, project for implementation, project of works performed, project for operation and maintenance
                Investor: DARS d.d.
                Client: DARS d.d.


                Object properties: The tunnel is two-laned with a hard shoulder, length L=260 m

                 

                The left tube of the Ljubno tunnel at the highway section Peračica – Podtabor was built in 2007. The cross section width between the existing right and the new left tunnel tube is 42 m. The construction of the tunnel was planned according to the NATM principle. The main characteristics in planning the construction of the tunnel tube were the specific chemical-physical properties of the pyrite-clay (hill layers) such as swelling and the content of pyrite, which represents a hazard for the sulphate corrosion of concrete. The thickness of the planned primary coating was 30 cm, the excavation of the profile was separately divided into a skullcap and joined step and floor arch. The left tunnel tube represents a rarity in tunnel construction outside of urban areas, because the secondary coating with a thickness of 35 cm is reinforced due to possible changes in the rheological properties of surrounding hills. The tunnel is also special due to the execution of the external tunnel arrangement with reinforced earth, which, together with the wider surroundings, represents a unified architectural whole.



                https://0501.nccdn.net/4_2/000/000/001/068/30753_1555057890_199_30753.jpg
                https://0501.nccdn.net/4_2/000/000/03f/ac7/30779_1555057892_125_30779.jpg
                https://0501.nccdn.net/4_2/000/000/001/068/30753_1555057890_199_30753.jpg
                https://0501.nccdn.net/4_2/000/000/03f/ac7/30779_1555057892_125_30779.jpg
                Predor Ljubno desna cev

                Project documentation: Design concept, project for obtaining a building permit, project for tender, project for implementation


                Investor: DARS d.d.
                Client: DARS d.d.
                Object properties: The tunnel is two-laned with a hard shoulder, length L=260 m

                 

                The existing right tube of the tunnel Ljubno that has been used for approx. 40 years was foreseen within the design of the highway program for reconstruction as a part of the highway section Peračica - Podtabor. The cross section width between the existing right and the new left tunnel tube is 42 m. The execution of the reconstruction with the expansion of the existing profile to a two-laned profile with a hard shoulder was designed according to the NATM principle. Like the left tunnel tube, the main characteristics in planning the construction of the tunnel tube were derived from the specific chemical-physical properties of the pyrite-clay (hill layers) such as swelling and the content of pyrite, which can cause sulphate corrosion of concrete. The thickness of the planned primary coating was 30 cm; the expansion of the profile was separately divided into a skullcap and joined step and floor arch. Such reconstruction is the first in Slovenia. Like for the left tube, the external arrangement of the tunnel shall be performed with reinforced earth, which will, together with the left tube and the surrounding hills, represent a unified architectural whole



                https://0501.nccdn.net/4_2/000/000/017/e75/30766_1555057891_77_30766.jpg
                https://0501.nccdn.net/4_2/000/000/057/fca/30805_1555057894_91_30805.jpg
                https://0501.nccdn.net/4_2/000/000/017/e75/30766_1555057891_77_30766.jpg
                https://0501.nccdn.net/4_2/000/000/057/fca/30805_1555057894_91_30805.jpg
                Predor Sten
                https://0501.nccdn.net/4_2/000/000/05a/a3f/30818_1555057894_37_30818.jpg
                https://0501.nccdn.net/4_2/000/000/08b/137/25725_1555057896_18_25725.jpg
                https://0501.nccdn.net/4_2/000/000/07d/95b/30844_1555057896_165_30844.jpg
                https://0501.nccdn.net/4_2/000/000/017/e75/30870_1555057897_255_30870.jpg
                https://0501.nccdn.net/4_2/000/000/05a/a3f/30818_1555057894_37_30818.jpg
                https://0501.nccdn.net/4_2/000/000/08b/137/25725_1555057896_18_25725.jpg
                https://0501.nccdn.net/4_2/000/000/07d/95b/30844_1555057896_165_30844.jpg
                https://0501.nccdn.net/4_2/000/000/017/e75/30870_1555057897_255_30870.jpg

                Pošljite nam povpraševanje ali nas pokličite za svetovanje


                Premikamo meje, ustvarjamo poti.


                POŠLJI POVPRAŠEVANJEPOŠLJI POVPRAŠEVANJE


                Send us an inquiry or contact us for a consultation


                We are pushing boundaries and creating pathways.


                SEND INQUIRYSEND INQUIRY


                Invalid Form properties detected


                 

                Kontaktirajte nas


                GEOPORTAL d.o.o.


                Tehnološki park 21, 1000 Ljubljana
                  

                + 386 (0)1 620 33 20
                  

                info@geoportal.si

                Invalid Form properties detected


                 

                Contact us


                GEOPORTAL d.o.o.


                Tehnološki park 21, 1000 Ljubljana
                  

                + 386 (0)1 620 33 20
                  

                info@geoportal.si

                • Domov
                • O podjetju
                • Storitve
                • Reference
                • O nas
                • FINE Software
                • Kontakt
                • Politka spletnih piškotkov
                • Home
                • About the company
                • Services
                • References
                • About us
                • FINE Software
                • Contact
                • Cookie policy

                Vse pravice pridržane © 2018

                Izdelava spletne strani Spletnik
                close lightbox