Western Railway, Station Building, Vithaldas Thackersey Marg, Churchgate, Mumbai, Maharashtra 400020, Indija, tel. +91 22 2200 2590
INR 159.14 Cr.
PRELIMINARY DESIGN, PREFINAL DESIGN, FINAL DESIGN
Est. 2020
Basic information:
⦁ Tunnel length: 2967 m
⦁ Under ground: 2696 m
⦁ Cut & cover: 271 m
⦁ Portals: 193 m
⦁ Traction: Electric traction
⦁ Overburden: 4 – 21 meters
⦁ Speed: 100 kmph
⦁ Geology: Disintegrated/Fractured Basalt
⦁ Track type: Ballasted track
⦁ Seismic zone: III
Railway root for new single BG line between Dahod-Indore via Sardapur, Jhabua & Dhar was defined by authorities. Micro location of tunnel lies between Tihi and Pithampur stations. The tunnel is located between CH: 24470 to CH: 27630 with length of 3.16 km. The alignment is passing through a hilly terrain nearby the Pithampur Industrial area of Dahod-Indore new B.G line. The overburden is varying from 4 m to 21 m at this location.