Arbri road – road tunnels T2, T3, T4, T5, T6

Arbri-Tunnel-1-Geoportal
Arbri-Tunnel-1-Geoportal
Arbri-Tunnel-3-Geoportal
Arbri-Tunnel-3-Geoportal
Arbri-Tunnel-4-Geoportal
Arbri-Tunnel-4-Geoportal
Arbri-Tunnel-5-Geoportal
Arbri-Tunnel-5-Geoportal
Arbri-Tunnel-6-Geoportal
Arbri-Tunnel-6-Geoportal
previous arrow
next arrow
Arbri-Tunnel-1-Geoportal
Arbri-Tunnel-3-Geoportal
Arbri-Tunnel-4-Geoportal
Arbri-Tunnel-5-Geoportal
Arbri-Tunnel-6-Geoportal
previous arrow
next arrow
Investor

ALBANIAN MINISTRY OF TRANSPORT AND INFRASTRUCTURE
SQUARE “SKËNDERBEJ” NO.5 , TIRANË, ALBANIA

Investment value

INR 2320,00 Crore

Project documentation

FINAL DESIGN

year of completion

****

characteristics of the faculty

Basic information:
• Length of tubes: 290 m (T2), 460 m (T3), 361 m (T4), 505 m (T5), 335 m (T6)
• Area of clearance profile: 44.25 m2
• Excavation area: 96 m2
• Maximal overburden height: 65 m (T2), 130 m (T3), 155 m (T4), 165 m (T5), 125 m (T6)
• Longitudinal gradient: 1,8 %– 7,36 %